Construction Projects Scheduled for the 2016 Construction Season

 

Wick Road Reconstruction

Wick Road is being reconstructed and converted to a boulevard from 1000 feet west of Vining Road to 3000 feet east of Vining Road:  The project includes the installation of a large diameter transmission water main.

Wickham Road Water Main and Paving

A new 8-inch water main is being installed on the east side of Wickham Road from Merriman Road to Wick Road.  Following the water main installation, the road will be resurfaced.

Pennsylvania Road Water Main

A new 12-inch water main is being installed on the north side of Pennsylvania Road between Wahrman Road and Wayne Road.