Project Limits: Citywide. Specifically, all buildings containing a water service line less than 4” in diameter and installed prior to 1989. This phase encompasses a randomly generated address list whose property owners have been notified of their selection. The selection process was prescribed by the Michigan Department of Environment, Great Lakes and Energy (EGLE).

Project Description: Complete inspection of water service line material. Inspections will be located at the curb stop box and where the water service enters the building.

Traffic Impact/Detour: Minimal traffic impact while inspection at curb stop box occurs. No detour will be required.

Schedule: This project began in December 2022 and will tentatively be completed December 2024.

PROJECT UPDATE:

Residents will be notified to schedule the inspection of their water service line where it enters the building.  Inspections take 5-10 minutes of your time.